A 300 Lot 3 Phase job, our contract included all onsite underground utilities, rock, curb and paving. The Offsite work included two Penn DOT Permits which highlighted a storm sewer construction and a box culvert extension, full depth paving restoration and widening and full width milling and overlay.
Meadows at Skippack
A 125 Lot, 2 Phase job. The contract included all excavation and utility work. The major parts of the job included two Penn DOT widenings, 27 Foot Deep Sanitary Sewer Install, Redesign of the sanitary to eliminate Grinder Pumps and a 120lf Box Culvert.
David Erb Contractors, Engineering, Surveying and Land Planning Services Department brings a unique and fresh new outlook to the current land development field. Combining all of the essential elements and professions under one umbrella offers you the client, the opportunity to have "one stop shopping" for all of your land planning and development needs. Your project can be surveyed, designed, represented, estimated and built to your satisfaction without the need for the hiring of multiple firms or individuals, thus eliminating both costly and time consuming efforts.